Powered Land

Powered land for AI infrastructure.

Turn vacant land, Bitcoin mining facilities and other power-backed sites into locations for modular compute pods. We target accessible U.S. sites with 10–150+ MW, available now or through a documented utility path.

Already operate a data center or colocation facility? Explore Modular Compute for Data Center Owners

Aerial view of a powered compute campus

01Site criteria

What we look for

Vacant powered land, Bitcoin mining facilities with service that can support firm load, and brownfield or industrial sites with existing service.

Power

10–150+ MW of firm utility power, available now or on a documented path.

Proof

Written utility support, such as a will-serve letter, helps establish the power path.

Location

U.S. sites within reasonable reach of a metro area, in jurisdictions that support data centers.

Land

Flat, buildable and sized to the power, outside floodplains and wetlands.

Zoning

Zoned for data center or industrial use, or a clear path to it.

Infrastructure

Substation, fiber and water nearby.

Site control

You own the site or are authorized to market it.

Submit a site

02Sites for pod deployment

Different sites. One power-first approach.

Deploy modular compute pods with 1–5 MW of IT capacity per pod, planned around verified power and site infrastructure.

Vacant land

Power access. No building required to start.

Energized land or sites with documented utility access, with room for pods and supporting infrastructure.

Bitcoin mining facilities

Evaluate a new use for a power-backed site.

Existing power connections and deployment space that may support AI compute after electrical, cooling and fiber review.

Other existing sites

Deploy around the site's usable power.

Brownfield and industrial properties where usable power and site conditions support phased pod deployment.

03Project vision

What a powered campus could look like.

04Process

From qualification to project structure.

Qualified sites move through utility verification and commercial review.

01

Screen the site

Review location, site control, zoning path and utility documentation.

02

Verify capacity

Confirm usable power, equipment fit, fiber, water and access.

03

Structure the opportunity

Align owners and project partners on a potential purchase, lease or development path.

Contact

Share a site. We'll screen it.

Send a location and a few electrical details, or tell us what capacity you need and where.

Prefer email? info@xctdigital.com