Active power filters (APFs)
Measure each circuit's current and inject an equal and opposite current, canceling harmonics and reactive power in real time.
XECO Power Optimization · Patent US 12,375,324 B2
Improve power quality and put unused electrical capacity to work at existing data centers and colocation facilities. Our patented XECO technology, installed as ECBS (Energy Current Balancing System) units, removes harmonic and reactive current in real time.

01The Technology
ECBS is a set of devices that work together to clean up power across a site. Each one has a job:
Devices are placed near the loads, circuit by circuit, so correction holds as AI workloads swing.
Measure each circuit's current and inject an equal and opposite current, canceling harmonics and reactive power in real time.
Absorb lower-order harmonics and high-frequency noise close to the load.
Keep filtered harmonic current from recirculating through the neutral.
Meters at the main switchgear and on every filter, feeding your building management system.
ECBS raises power factor to > 0.98. The result: less current for the same IT load, cooler equipment, more headroom and stable voltage on utility, generator or UPS.

Installation
ECBS units connect in parallel at spare breakers on panels, switchgear or fuse disconnects, covering the main circuits. Installation scope and any outage requirements are confirmed during site engineering.
02Live Monitoring
Revenue-grade metering shows what's connected, what's in use and what ECBS has recovered.
03How ECBS Works
The problem
Transformers are sized with margin, and harmonic and reactive current eat into what's left. Mixed loads such as VFDs, UPS systems and legacy IT draw distorted current that heats windings and forces derating.
ECBS
Patented ECBS units correct harmonic and reactive current in real time, responding in under 100μs.
The result
ECBS raises power factor to > 0.98, reducing the apparent power (kVA) needed for the same IT load. That can free up capacity for compute or other loads. Results are site-specific.
04Case Study
A multi-tenant colocation facility with more than 10 MW of demand, double-conversion UPS and transformers already designed for harmonic loads.
Measured on site. Results vary by site.